KANGALABâtiment & Travaux Publics
Construction of the Stinger road — Wahgnion mine
← Back to projects

Construction of the Stinger road — Wahgnion mine

Period

June 2022 — September 2022

Location

Sobara, Burkina Faso

Status

Delivered

Scope of works

Earthworks, crossing structures (steel culverts), ore haul platform and site building.

Site record

Drag, or use the arrow keys

  • Steel culverts laid out before installation
  • Platform stripping by dozer
  • Installing a crossing structure
  • Assembling the culvert plates
  • Crews mobilised along the alignment
  • Crew at the crossing structure
  • Roof structure of the site building
  • Reading the construction drawings
  • Surveying the alignment
  • Culvert stock before placement

Construction of the Stinger road — Wahgnion mine

Steel culverts laid out before installation

01/ 10

Site footage

Drag to browse

  • Steel culvert installation

Have a project? Let's talk.

Tell us about your project: scope of works, location, timeline. We will come back to you with a proposal.